阳光板雨棚如何施工?施工过程中要注意哪些细节?

来源:http://www.wanzhongyue.com/ 日期:2019-12-03 发布人:admin 浏览次数:

  阳光板应用场景丰富,因为阳光板透明度高,重量轻,抗冲击,隔音隔热、抗老化和不易燃等优点突出,被广泛应用到温室大棚,车棚,雨棚,雨搭,阳光房和采光顶等方面,接下来我们主要讲一下阳光板应用到雨棚方面的施工细节和施工顺序:
济南阳光板
  The sun board is rich in application scene, because the sunlight board has many advantages such as high transparency, light weight, impact resistance, sound insulation, heat insulation, anti-aging and non inflammable. It is widely used in greenhouse, bicycle shed, rain shelter, rain shelter, sunshine room and daylighting roof. Next, we will mainly talk about the construction details and construction sequence of the sun board applied to the canopy.
  一、施工方法
  I. construction method
  1、施工顺序
  1. Construction sequence
  测量放线安装阳光板顶棚主骨架调整、调平、固定阳光板顶棚主骨架安装调平阳光板顶棚次骨架安装阳光板外层打胶、安装压条安装阳光板内层打胶、安装压条阳光板顶棚外部檐口细部调整与处理。
  Measure, set out, install, adjust and level the main framework of the solar panel ceiling, install and level the main framework of the solar panel ceiling, install the outer layer of the solar panel, install the inner layer of the solar panel, and install the outer cornice of the solar panel.
  2、主要施工工艺
  2. Main construction technology
  (1)弹线:根据图纸的标高及PC阳光板顶棚位置尺寸和已测定的中心线,弹出阳光板顶棚丰骨架位置线。
  (1) snapping line: according to the elevation of the drawing, the position and size of the PC sun board ceiling and the measured center line, snap the position line of the sun board ceiling with abundant skeleton.
  (2)预埋件:根据标高控制线阳光板顶棚主骨架位置,检查洞口反梁上表而标高是否符合设计要求,如有差异应剔凿或用高强度等级水泥砂浆找平处理,达到强度后,按深化设计节点详图预埋钢板尺寸放出膨胀螺栓位置线,然后钻孔安放膨胀螺栓,安装钢板与胀栓固定。再将主骨架III)L线投至预埋钢板上。
  (2) embedded parts: according to the elevation control line, the position of the main framework of the sun board ceiling, check whether the elevation on the back beam of the hole meets the design requirements. If there is any difference, chisel or level with high-strength cement mortar. After reaching the strength, set out the position line of the expansion bolt according to the size of the embedded steel plate in the detailed drawing of the detailed design node, then drill the hole to place the expansion bolt, install the steel plate and fix the expansion bolt Fixed. Then put the main framework III) l line onto the embedded steel plate.
  (3)安装主骨架:根据弹出阳光板顶棚主骨架位置线,先安装两端后中间部分,其方法:将60mm*40mm*3mm方钢管丰骨架在屋面上组装好后,用人力安放在位置线上,用线坠吊垂直而,中间临时固定后与预埋钢板进行焊接。两端主骨架安好后,拉中间和两侧各1500mm高度(从钢板两端支座往一卜量)三条纵向通线后,再从一端向另一端逐个安装至全部完成。
  (3) installation of main framework: according to the position line of the main framework of the sun board ceiling, install the two ends first and then the middle part. The method is: assemble the 60mm * 40MM * 3mm square steel pipe abundant framework on the roof, place it on the position line manually, hang it vertically with a plumb crane, and weld it with the embedded steel plate after the middle is temporarily fixed. After the main framework at both ends is installed, pull three longitudinal connecting lines with a height of 1500mm at the middle and both sides respectively (from the supports at both ends of the steel plate to one measurement), and then install them one by one from one end to the other end until they are all completed.
  (4)安装次骨架:在阳光板顶棚主骨架安装固定完毕后,安装阳光板顶棚60mm*40mm*3mm方钢次骨架,并调准位置,调平后,与主骨架焊接固定。在安装阳光板的同时,安放防潮剂。
  (4) installation of secondary framework: after the installation and fixation of the main framework of the solar panel ceiling, install the 60mm * 40MM * 3mm square steel secondary framework of the solar panel ceiling, and adjust the position. After leveling, weld and fix it with the main framework. Put moisture-proof agent while installing the sun plate.
  (5)安装外层阳光板:按照深化设计排版位置,将准备好尺寸合适的阳光板进行安装,安装完后阳光板的边、纵缝、横缝在+条线上。
  (5) installation of outer solar panel: according to the layout position of the detailed design, prepare the solar panel with appropriate size for installation. After installation, the edge, longitudinal seam and transverse seam of the solar panel are on the + line.
  (6)打胶、安装压条:在充分检查外层阳光板的安装质量后,边安装外层阳光板,边打耐候胶,再安装专刖铝合金压条。安装压条的螺钉问距及位置必须符合图纸要求。
  (6) gluing and installation of batten: after fully checking the installation quality of the outer solar panel, install the outer solar panel while applying weather resistant glue, and then install the special aluminum alloy batten. The spacing and position of the screws for installing the battens must meet the requirements of the drawings.
  (7)安装内层阳光板:按照图纸位置,将准备好尺寸合适的阳光板进行安装,安装时应将上层板底用白毛巾清擦干净,同时,在内层阳光板上面清擦干净后方允许安装,以免夹层污染无法清洗,影响宏观效果。
  (7) installation of inner solar panel: according to the drawing position, prepare the solar panel with proper size for installation. During installation, clean the bottom of the upper panel with white towel, and at the same time, install the inner solar panel after cleaning, so as to avoid interlayer pollution, failure to clean and impact on the macro effect.
  (8)打胶、安装压条:在充分检查内层阳光板的安装质量后,边安装内层阳光板,边打耐候胶,安装专用铝合金压条。压条的螺钉问距及位置必须符合图纸要求。
  (8) gluing and installation of battens: after fully checking the installation quality of the inner solar panel, install the inner solar panel, apply weather resistant glue and install special aluminum alloy battens. The screw spacing and position of the batten must meet the requirements of the drawing.
  (9)在阳光板全部安装完毕后,阳光板顶棚外檐周圈也必须按图纸中的节点进行施工。在外檐全部封闭完后才可以将防护棚拆除。防护棚必须按脚手架拆除要求进行,并进行成品保护,防-II:将成品砸坏。
  (9) after all the solar panels are installed, the outer eave circle of the solar panel ceiling must also be constructed according to the nodes in the drawing. The protective shed can only be removed after the external eaves are completely closed. The protective shed must be carried out according to the requirements of scaffold removal, and the finished products shall be protected against - II: smashing the finished products.
  二、质量标准及质量保证措施
  II. Quality standards and quality assurance measures
  1、本工程钢架结构制作、安装质量,按照《钢结构施工及验收规范》(GB50205-96)标准执行。
  1. The fabrication and installation quality of the steel frame structure of the project shall be in accordance with the code for construction and acceptance of steel structures (gb50205-96).
  2、方钢主骨架及钢构件要按分类、型号、支装顺序进行堆放,以方便取用,不可重叠堆放构件;堆放弧形方钢骨架(屋架)时,下部要垫放小条。
  2. The square steel main framework and steel members shall be stacked according to the classification, model and installation sequence to facilitate access and do not stack the members by overlapping; when stacking the arc-shaped square steel framework (roof truss), the lower part shall be padded with small strips.
  3、方钢丰骨架安装前必须核对儿何尺寸,对焊缝质量、螺孔位置等进行全面检查,完全符合设计要求后才能进行安装。
  3. Before the installation of fanggangfeng framework, it is necessary to check the size, weld quality, screw hole position, etc., and the installation can only be carried out after they fully meet the design requirements.
  4、阳光板的切割及运输必须要保证质量。特别要注意阳光板两端封头,确保不损坏,避免透气污染内部。
  4. The cutting and transportation of the solar panel must ensure the quality. Pay special attention to the head of both ends of the solar panel to ensure that it is not damaged and to avoid air permeability and internal pollution.
  5、钢骨架的运输必须轻拿轻放,保证不碰撞,PC阳光板长距离运输必须用小箱进行包装。
  5. The transportation of steel framework must be handled with care to ensure no collision. The long-distance transportation of PC sunshine board must be packed in small boxes.
  三、安全消防措施
  III. fire safety measures
  1、进入施工现场必须严格遵守安全操作规程。
  1. Enter the construction site in strict accordance with the safety operation regulations.
  2、高空作业人员必须系好安全带,手头丁具要放在工具袋内,高空作业不可扔抛工具。
  2. The high-altitude operators must fasten their safety belts, put the tools in the tool bag, and do not throw the tools.
  3、脚于架必须按规定搭设,施工中定期检查脚于架的稳定情况,施工人员上下应从爬梯走。
  3. The foot on the scaffold must be erected according to the regulations. During the construction, the stability of the foot on the scaffold shall be checked regularly. The construction personnel shall walk up and down from the ladder.
  4、电焊工及特殊工种持证上岗,并设专人看火。
  4. Electric welders and special types of work shall be employed with certificates, and special personnel shall be assigned to watch the fire.
  5、现场防火专人管理,并设专用消防用具。
  5. Special personnel shall be assigned to manage the fire prevention on site, and special fire-fighting appliances shall be provided.
  四、成品保护
  IV. finished product protection
  1、阳光板两端封头为防止损坏,跑气造成内壁污染采取加贴一层厚保护膜。
  1. In order to prevent damage to the head at both ends of the solar panel, a thick protective film shall be pasted on the inner wall due to air leakage.
  2、骨架施工前应严格码放整齐,防止变形。
  2. The framework shall be stacked in order to prevent deformation before construction.
  3、阳光板在安装过程中要防止碰撞、划伤。
  3. Prevent collision and scratch during the installation of the solar panel.
相关新闻


  天桥区巨龙采光板经销处            联系人:万经理            座机:15806664558
 手机:15806664558        15066129603       
  技术支持: 济南诺商   鲁ICP备14016125号-1 网站地图 XML TXT

统一服务热线

15806664558 

鲁公网安备 37010502001033号

【本站图片均由网站所有方提供,部分图片来源于网络,如无意中侵犯了某媒体或个人的知识产权,请来信或来电告之,本网站将立即删除。】